Where we work
Interior Design and Renovation in Bay Village

Bay Village ends at the water. Streets run north off Lake Road and stop at the bluff, and that geography sets the terms for everything — which rooms get the long view, which elevations take the weather, where a home wants its glass and where it wants a wall. Joseph and Lydia Cahoon arrived here in October 1810 and built Rose Hill in 1818 out of timber milled on their own land. The house is still standing in Cahoon Memorial Park.
Almost everything around it is far newer, and that is the interesting part of the brief. A post-war home in Bay Village usually has good bones and very little inherited character, which means the warmth has to be built in — old wood, brass with wear on it, a table that has been somewhere before. A home that looks gathered rather than decorated does not require an old house. It requires patience and a plan.
A city built mostly after the war
The population figures tell it plainly. Bay Village had roughly 450 residents in 1910 and 3,700 in 1940. It incorporated as a village in 1903, became a city in 1950 with 6,917 people, and counted 16,163 in the 2020 census. The great majority of the housing followed that curve, filling in from the 1930s onward across four and a half square miles of land.
What you get is a mix. Craftsman, Tudor and colonial houses from the earlier decades, then Cape Cods, ranches and split levels through the 1950s and 1960s, larger houses along the lake, and newer construction filling in since. Cahoon Memorial Park came from Ida Cahoon's 1917 bequest of the family home and 115 acres. The Huntington Reservation, the Lake Erie Nature and Science Center and BAYarts hold the waterfront to the west.
Building near the bluff
Lakefront work in Ohio carries a state permit that has nothing to do with taste. Under Ohio Revised Code 1506.07 the Director of Natural Resources identifies coastal erosion areas along Lake Erie, and inside one a permit from the Director is required before a permanent structure is erected, constructed or redeveloped. The Director has thirty days on a complete application to approve it, deny it with reasons, or request modifications.
In practice, approval turns on the site being protected by an erosion control measure the Director has approved, or on the structure being movable and set as far landward as zoning allows. Structures already permitted before the rules took effect, and property not adjacent to the lake, sit outside it. On a lakefront addition that is a real scheduling item and it belongs in the programme at the start. We have worked with architectural review boards across northeast Ohio, and we plan around approvals rather than hoping about them.
What a Bay Village project actually asks for
A 1958 ranch is a different brief from a 1912 double. Ceilings sit lower, plans are compartmentalised, and the pleasure of the house is often locked behind a wall between the kitchen and the room with the view. Opening that up is structural work rather than decorating, and it begins with knowing what is bearing and where the ductwork runs.
The other half of the job is character. These homes were built plainly, so depth has to be introduced: real materials, joinery with some weight to it, antique and vintage pieces set among new ones so that nothing looks bought on the same afternoon. Anything fifty years or older here can also draw on the Heritage Home Program, which Bay Village takes part in — technical advice and a fixed-rate rehabilitation loan.
Working together
New construction is a genuine part of the work in Bay Village, on lakefront and infill lots both. A new build runs twelve to eighteen months and starts at $1.5M in total project cost. Renovations begin at a $100,000 total project minimum, with full-home work generally from $350,000. Those are project figures — construction, cabinetry, materials, furnishings — not our design fees, which are quoted to the scope.
The first step is a free thirty-minute Discovery Call by phone. From there, engagements begin with a $5,000 retainer credited against the final invoice, and we book eight to twelve weeks ahead of design starting. Your contractor contracts directly with you. We visit the site every other week during construction, and we would rather be the studio you call again in five years than the one that finished and disappeared.
Also close by
Our studio is at 5900 Detroit Avenue, so most of this is a short drive. We also work well beyond Ohio — Florida, the Great Lakes, the Northeast and the Mountain West. We go to the house, wherever it is.